In Levane (AR), we built a highly versatile multi-story structure, combining POKER floor slabs with ONDAL systems in conjunction with thermal insulation panels. The prefabricated building, constructed for Gruppo Cartotecnico Valdarnese, a company operating in the paper converting sector, is intended for packaging production.
The company has made quality an essential cornerstone that has allowed it to proudly serve the most prestigious international brands across various sectors. The collaboration between Manini Prefabbricati and GCV represents the perfect example of a meeting between industry leaders and a match between two corporate philosophies.
25 January 2023
Central Italy, New Projects, Tuscany